Let's Go Play Outside
Hiking Stone Bridge Trail - panoramic view
--°C
Loading...
See forecast →

Hiking in Stone Bridge Trail: trails, map and practical info

Northern New Jersey • New Jersey

Stone Bridge Trail (Northern New Jersey, New Jersey) : very hard hike, 36.9 km, 1,496 m of elevation gain, summit at 2,469 m, about 12h30.

36.9 km
Distance
12h30
Duration
1,496 m
Elevation
Difficulty
Very hard
Max altitude
2,469 m
Recommended for :
Intermediate hikers

Ready to explore Stone Bridge Trail? Here's everything you need to know before you go!

Discover the trail

1 community photos

Photos: Zeete — CC BY-SA 4.0 (Wikimedia Commons)

Trail description

The Stonebridge Railway was a railway line between Whitacre Junction and Hampton-in-Arden in Warwickshire, England, passing through Stonebridge. It had an intermediate station at Coleshill, which was renamed Maxstoke in 1923. The railway opened in 1839 as part of the Birmingham and Derby Junction Railway (B&DJR). It was a key part of that company's route from the North Midlands and Yorkshire, to connect with the London and Birmingham Railway (L&BR) and the South East. The line to Birmingham Lawley Street opened on February 10, 1842. After a period of fierce competition between the B&DJR and the Midland Counties Railway (MCR) for the coal traffic to London (the MCR had a shorter route that joined with the L&BR at Rugby), the two merged, with the North Midland Railway, to form the Midland Railway. As all the London traffic was now diverted on the former MCR route, the Stonebridge Railway lost all strategic importance and became in effect a minor branch line. When originally opened, the Stonebridge Railway was a double tracked main line, though the second running line was removed in 1843. This is believed to be the first "singling" (downgrading a railway to single track operation) in railway history. Even after the line was singled, until February 1845, two of the three daily services each way carried through coaches to London. The daily service was reduced from three trains to two in 1859, and from May 1877 the service was reduced to a Parliamentary train service of a single morning train in each direction. This being the minimum level of service required by law. This lasted until 1917, when the passenger service was finally withdrawn as a wartime economy measure, while under government control (but not ownership) during the First World War. The line continued in use for freight until 1935 when it was officially closed, following a bridge failure in Packington. However, the track at the northern end remained in place, and was used as a siding for the storage of disabled wagons between the mid 1930s and 1951, when the track was finally removed. The Hampton end track had become a minor siding, and was lifted in 1963. Two of the most famous men in the history of the Midland Railway were associated with this line - Sir James Joseph Allport (who started his career as a traffic agent in Hampden in Arden), and Matthew Kirtley (who was once the locomotive superintendent of the B&DJR).
Free 1 pages

The Essential Hiking Checklist

Everything you need for your next hike. Bilingual, printable, 1 page.

Get your free hiking checklist

Recommended gear for this trail

As an Amazon Associate I earn from qualifying purchases.

LGPO Pick
Elixir Tour Mid WP
Salomon
Elixir Tour Mid WP
4.5 (2847 reviews)
Waterproof mid-height boot ideal for rocky terrain
203.38 $
See price
Best Value
Trail Ergo Cork
Black Diamond
Trail Ergo Cork
4.4 (1456 reviews)
Comfortable cork grip for long ascents
69.99 $
See price
Daylite Plus 20L
Osprey
Daylite Plus 20L
4.7 (3215 reviews)
Lightweight and versatile for day hikes
109.99 $
See price
Actik Core 625
Petzl
Actik Core 625
4.6 (1893 reviews)
USB rechargeable with 600 lumens for early starts
103.95 $
See price
Most Popular
Wide Mouth 1L
Nalgene
Wide Mouth 1L
4.8 (12540 reviews)
Unbreakable and BPA-free — a hiking essential
23.11 $
See price
Affiliate links — LGPO may earn a commission at no extra cost to you.

Ready to go?

Everything you need to know before you go

Where?

Address
Not available
GPS coordinates
40.0626, 40.0626
Phone
Not available

When?

Opening hours
No information
Varies by season
Best season
Fall
Spectacular colors
Best time
Early morning
Less crowded
Weather (next days)
Loading

How much?

Entry fees
Adult
Not available
Child
—
What to bring?

As an Amazon Associate I earn from qualifying purchases.

Affiliate links — LGPO may earn a commission at no extra cost to you.

Gear
Download the PDF checklist
Water & food
2L minimum
No water point on the trail
Bring energy snacks for a 4h+ hike
Good to know
Safety
Download the GPX before you go
Limited cellular coverage on the trail
Slippery after rain
Be careful on rocky sections
In an emergency
Emergency
911
Parking GPS
40.0626, 40.0626
Center
Not available

Hikers' opinions

Be the first to review!

No hiker has shared their experience yet. Share your impressions and help other hikers!

FAQ - Frequently asked questions

Everything you need to know
Stone Bridge Trail is rated very hard.
The elevation gain of Stone Bridge Trail is 1,496 m.
The summit of Stone Bridge Trail is at 2,469 m.
Allow about 12h30 for Stone Bridge Trail (36.9 km).
No, Stone Bridge Trail has no visitor centre on site.
Didn't find your answer?
Top 10 best hiking in Northern New Jersey
Our ranking based on hiker reviews

Hiking near Sydney

22 trails to explore ~7615 km away

View trails
Did you spot an error?

We work hard to provide the most up-to-date and error-free data possible. If something seems incorrect, let us know!

Update : October 2026